Estimate the major materials and the labour of a one or multi-storied RCC-frame building with brick infill: cement, steel, sand, aggregate, bricks, finishes and skilled and unskilled mandays. Preliminary quantities only, not a substitute for a BOQ, structural design or bar bending schedule.

No separate help page is available for this topic ...


Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Help
Group Key Label Value Default
density light Frame concrete, light (m³ per sft of floor) 0.024 0.024
density lean Frame concrete, lean (m³ per sft of floor) 0.030 0.030
density typical Frame concrete, typical (m³ per sft of floor) 0.034 0.034
density heavy Frame concrete, heavy (m³ per sft of floor) 0.040 0.040
steel_scale light Frame steel scale, light (multiplier on member steel) 0.800 0.800
steel_scale lean Frame steel scale, lean (multiplier on member steel) 1.000 1.000
steel_scale typical Frame steel scale, typical (multiplier on member steel) 1.000 1.000
steel_scale heavy Frame steel scale, heavy (multiplier on member steel) 1.000 1.000
member_share footing Share of frame concrete in footing (fraction of total) 0.120 0.120
member_share column Share of frame concrete in column (fraction of total) 0.180 0.180
member_share beam Share of frame concrete in beam (fraction of total) 0.220 0.220
member_share slab Share of frame concrete in slab (fraction of total) 0.480 0.480
steel_kg_m3 footing Steel in footing (kg per m³ of concrete) 65.000 65.000
steel_kg_m3 column Steel in column (kg per m³ of concrete) 190.000 190.000
steel_kg_m3 beam Steel in beam (kg per m³ of concrete) 130.000 130.000
steel_kg_m3 slab Steel in slab (kg per m³ of concrete) 75.000 75.000
steel_kg_m3 stair Steel in stair (kg per m³ of concrete) 100.000 100.000
steel_kg_m3 lintel Steel in lintel (kg per m³ of concrete) 70.000 70.000
formwork_m2_m3 footing Formwork for footing (m² per m³ of concrete) 4.000 4.000
formwork_m2_m3 column Formwork for column (m² per m³ of concrete) 12.000 12.000
formwork_m2_m3 beam Formwork for beam (m² per m³ of concrete) 11.000 11.000
formwork_m2_m3 slab Formwork for slab (m² per m³ of concrete) 8.000 8.000
formwork_m2_m3 stair Formwork for stair (m² per m³ of concrete) 5.000 5.000
formwork_m2_m3 lintel Formwork for lintel (m² per m³ of concrete) 12.000 12.000
floor_scale 1_2 Concrete and steel on 1-2 floors (multiplier) 1.000 1.000
floor_scale 3_4 Concrete and steel on 3-4 floors (multiplier) 1.100 1.100
floor_scale 5_6 Concrete and steel on 5-6 floors (multiplier) 1.200 1.200
floor_scale 7_plus Concrete and steel on 7 or more floors (multiplier) 1.300 1.300
soil_scale good Footing concrete on good soil (multiplier) 0.900 0.900
soil_scale normal Footing concrete on normal soil (multiplier) 1.000 1.000
soil_scale poor Footing concrete on poor soil (multiplier) 1.300 1.300
seismic_steel normal Steel in normal seismic zone (multiplier) 1.000 1.000
seismic_steel high Steel in high seismic zone (multiplier) 1.150 1.150
steel_lap_wastage all Steel lap and wastage (fraction added) 0.070 0.070
mix_m10 cement M10 mix (used for PCC), cement (parts by volume) 1.000 1.000
mix_m10 sand M10 mix (used for PCC), sand (parts by volume) 3.000 3.000
mix_m10 aggregate M10 mix (used for PCC), aggregate (parts by volume) 6.000 6.000
mix_m15 cement M15 mix, cement (parts by volume) 1.000 1.000
mix_m15 sand M15 mix, sand (parts by volume) 2.000 2.000
mix_m15 aggregate M15 mix, aggregate (parts by volume) 4.000 4.000
mix_m20 cement M20 mix, cement (parts by volume) 1.000 1.000
mix_m20 sand M20 mix, sand (parts by volume) 1.500 1.500
mix_m20 aggregate M20 mix, aggregate (parts by volume) 3.000 3.000
pcc thickness_mm PCC layer thickness (mm) 75.000 75.000
pcc footing_depth_m Average footing depth (m) 0.450 0.450
pcc footing_projection PCC width beyond the footing (multiplier on footing plan) 1.200 1.200
geometry opening_share Doors and windows (fraction of wall area) 0.150 0.150
geometry beam_slab_depth_ft Beam and slab depth taken off the wall height (ft) 1.250 1.250
stair width_m Stair width (m) 1.000 1.000
stair riser_m Stair riser height (m) 0.170 0.170
stair tread_m Stair tread width (m) 0.250 0.250
stair waist_m Stair waist slab thickness (m) 0.150 0.150
stair landing_count Mid-landings per stair (number) 1.000 1.000
lintel opening_height_m Average opening height (m) 1.500 1.500
lintel bearing_allowance Lintel length for bearing (multiplier on opening width) 1.250 1.250
lintel depth_m Lintel depth (m) 0.150 0.150
finish plaster_in Plaster thickness (inch) 0.500 0.500
finish screed_in Floor screed thickness (inch) 2.000 2.000
finish tiled_share Tiled part of the floor (fraction of floor area) 0.900 0.900
finish paint_coats Paint coats (number) 2.000 2.000
finish paint_sft_per_l Paint coverage (sft per litre per coat) 100.000 100.000
wastage cement Wastage of cement (fraction added) 0.030 0.030
wastage sand Wastage of sand (fraction added) 0.070 0.070
wastage aggregate Wastage of aggregate (fraction added) 0.050 0.050
wastage tiles Wastage of tiles (fraction added) 0.100 0.100
wastage paint Wastage of paint (fraction added) 0.050 0.050
wastage ready_mix Wastage of ready-mix (fraction added) 0.030 0.030
quick_cement_bag_sft low Quick rule: cement, low (bags per sft) 0.400 0.400
quick_cement_bag_sft typical Quick rule: cement, typical (bags per sft) 0.450 0.450
quick_cement_bag_sft high Quick rule: cement, high (bags per sft) 0.500 0.500
quick_steel_kg_sft low Quick rule: steel, low (kg per sft) 3.500 3.500
quick_steel_kg_sft typical Quick rule: steel, typical (kg per sft) 4.000 4.000
quick_steel_kg_sft high Quick rule: steel, high (kg per sft) 4.500 4.500
quick_concrete_m3_sft low Quick rule: concrete, low (m³ per sft) 0.033 0.033
quick_concrete_m3_sft typical Quick rule: concrete, typical (m³ per sft) 0.038 0.038
quick_concrete_m3_sft high Quick rule: concrete, high (m³ per sft) 0.042 0.042
quick_sand_cft_sft low Quick rule: sand, low (cft per sft) 1.100 1.100
quick_sand_cft_sft typical Quick rule: sand, typical (cft per sft) 1.200 1.200
quick_sand_cft_sft high Quick rule: sand, high (cft per sft) 1.300 1.300
quick_aggregate_cft_sft low Quick rule: coarse aggregate, low (cft per sft) 1.350 1.350
quick_aggregate_cft_sft typical Quick rule: coarse aggregate, typical (cft per sft) 1.450 1.450
quick_aggregate_cft_sft high Quick rule: coarse aggregate, high (cft per sft) 1.600 1.600
quick_bricks_sft low Quick rule: bricks, low (pcs per sft) 8.000 8.000
quick_bricks_sft typical Quick rule: bricks, typical (pcs per sft) 8.500 8.500
quick_bricks_sft high Quick rule: bricks, high (pcs per sft) 9.000 9.000
quick_area_sft_sft formwork Quick rule: formwork area (sft per sft of floor) 3.000 3.000
quick_area_sft_sft plaster Quick rule: plaster area (sft per sft of floor) 4.000 4.000
quick_area_sft_sft paint Quick rule: paint area (sft per sft of floor) 4.200 4.200
quick_area_sft_sft tiles Quick rule: tiles area (sft per sft of floor) 1.000 1.000
quick_rmc_removed cement Quick rule: cement that is concrete (fraction, dropped for ready-mix) 0.670 0.670
quick_rmc_removed sand Quick rule: sand that is concrete (fraction, dropped for ready-mix) 0.440 0.440
quick_rmc_removed aggregate Quick rule: aggregate that is concrete (fraction, dropped for ready-mix) 1.000 1.000
labour_skilled brickwork_m3 Skilled labour, brickwork (mandays per m³) 0.900 0.900
labour_skilled plaster_m2 Skilled labour, plaster (mandays per m²) 0.120 0.120
labour_skilled screed_tile_m2 Skilled labour, screed and tiles (mandays per m²) 0.160 0.160
labour_skilled concrete_m3 Skilled labour, structural concrete (mandays per m³) 0.200 0.200
labour_skilled pcc_m3 Skilled labour, PCC (mandays per m³) 0.100 0.100
labour_skilled formwork_m2 Skilled labour, formwork (mandays per m²) 0.250 0.250
labour_skilled steel_tonne Skilled labour, steel (mandays per tonne) 0.100 0.100
labour_skilled paint_m2 Skilled labour, paint (mandays per m²) 0.040 0.040
labour_skilled soling_m2 Skilled labour, soling (mandays per m²) 0.050 0.050
labour_unskilled brickwork_m3 Unskilled labour, brickwork (mandays per m³) 1.400 1.400
labour_unskilled plaster_m2 Unskilled labour, plaster (mandays per m²) 0.120 0.120
labour_unskilled screed_tile_m2 Unskilled labour, screed and tiles (mandays per m²) 0.160 0.160
labour_unskilled concrete_m3 Unskilled labour, structural concrete (mandays per m³) 2.250 2.250
labour_unskilled pcc_m3 Unskilled labour, PCC (mandays per m³) 1.000 1.000
labour_unskilled formwork_m2 Unskilled labour, formwork (mandays per m²) 0.250 0.250
labour_unskilled steel_tonne Unskilled labour, steel (mandays per tonne) 1.900 1.900
labour_unskilled paint_m2 Unskilled labour, paint (mandays per m²) 0.040 0.040
labour_unskilled soling_m2 Unskilled labour, soling (mandays per m²) 0.100 0.100
labour_rmc_scale skilled Ready-mix: skilled labour on concrete (fraction of site-mix mandays) 1.000 1.000
labour_rmc_scale unskilled Ready-mix: unskilled labour on concrete (fraction of site-mix mandays) 0.500 0.500


Calculator: building_cost_detailed, Created by: qcalc, V#0: , Variant owner: , Link,  Core