| density |
light |
Frame concrete, light (m³ per sft of floor) |
0.024 |
0.024 |
| density |
lean |
Frame concrete, lean (m³ per sft of floor) |
0.030 |
0.030 |
| density |
typical |
Frame concrete, typical (m³ per sft of floor) |
0.034 |
0.034 |
| density |
heavy |
Frame concrete, heavy (m³ per sft of floor) |
0.040 |
0.040 |
| steel_scale |
light |
Frame steel scale, light (multiplier on member steel) |
0.800 |
0.800 |
| steel_scale |
lean |
Frame steel scale, lean (multiplier on member steel) |
1.000 |
1.000 |
| steel_scale |
typical |
Frame steel scale, typical (multiplier on member steel) |
1.000 |
1.000 |
| steel_scale |
heavy |
Frame steel scale, heavy (multiplier on member steel) |
1.000 |
1.000 |
| member_share |
footing |
Share of frame concrete in footing (fraction of total) |
0.120 |
0.120 |
| member_share |
column |
Share of frame concrete in column (fraction of total) |
0.180 |
0.180 |
| member_share |
beam |
Share of frame concrete in beam (fraction of total) |
0.220 |
0.220 |
| member_share |
slab |
Share of frame concrete in slab (fraction of total) |
0.480 |
0.480 |
| steel_kg_m3 |
footing |
Steel in footing (kg per m³ of concrete) |
65.000 |
65.000 |
| steel_kg_m3 |
column |
Steel in column (kg per m³ of concrete) |
190.000 |
190.000 |
| steel_kg_m3 |
beam |
Steel in beam (kg per m³ of concrete) |
130.000 |
130.000 |
| steel_kg_m3 |
slab |
Steel in slab (kg per m³ of concrete) |
75.000 |
75.000 |
| steel_kg_m3 |
stair |
Steel in stair (kg per m³ of concrete) |
100.000 |
100.000 |
| steel_kg_m3 |
lintel |
Steel in lintel (kg per m³ of concrete) |
70.000 |
70.000 |
| formwork_m2_m3 |
footing |
Formwork for footing (m² per m³ of concrete) |
4.000 |
4.000 |
| formwork_m2_m3 |
column |
Formwork for column (m² per m³ of concrete) |
12.000 |
12.000 |
| formwork_m2_m3 |
beam |
Formwork for beam (m² per m³ of concrete) |
11.000 |
11.000 |
| formwork_m2_m3 |
slab |
Formwork for slab (m² per m³ of concrete) |
8.000 |
8.000 |
| formwork_m2_m3 |
stair |
Formwork for stair (m² per m³ of concrete) |
5.000 |
5.000 |
| formwork_m2_m3 |
lintel |
Formwork for lintel (m² per m³ of concrete) |
12.000 |
12.000 |
| floor_scale |
1_2 |
Concrete and steel on 1-2 floors (multiplier) |
1.000 |
1.000 |
| floor_scale |
3_4 |
Concrete and steel on 3-4 floors (multiplier) |
1.100 |
1.100 |
| floor_scale |
5_6 |
Concrete and steel on 5-6 floors (multiplier) |
1.200 |
1.200 |
| floor_scale |
7_plus |
Concrete and steel on 7 or more floors (multiplier) |
1.300 |
1.300 |
| soil_scale |
good |
Footing concrete on good soil (multiplier) |
0.900 |
0.900 |
| soil_scale |
normal |
Footing concrete on normal soil (multiplier) |
1.000 |
1.000 |
| soil_scale |
poor |
Footing concrete on poor soil (multiplier) |
1.300 |
1.300 |
| seismic_steel |
normal |
Steel in normal seismic zone (multiplier) |
1.000 |
1.000 |
| seismic_steel |
high |
Steel in high seismic zone (multiplier) |
1.150 |
1.150 |
| steel_lap_wastage |
all |
Steel lap and wastage (fraction added) |
0.070 |
0.070 |
| mix_m10 |
cement |
M10 mix (used for PCC), cement (parts by volume) |
1.000 |
1.000 |
| mix_m10 |
sand |
M10 mix (used for PCC), sand (parts by volume) |
3.000 |
3.000 |
| mix_m10 |
aggregate |
M10 mix (used for PCC), aggregate (parts by volume) |
6.000 |
6.000 |
| mix_m15 |
cement |
M15 mix, cement (parts by volume) |
1.000 |
1.000 |
| mix_m15 |
sand |
M15 mix, sand (parts by volume) |
2.000 |
2.000 |
| mix_m15 |
aggregate |
M15 mix, aggregate (parts by volume) |
4.000 |
4.000 |
| mix_m20 |
cement |
M20 mix, cement (parts by volume) |
1.000 |
1.000 |
| mix_m20 |
sand |
M20 mix, sand (parts by volume) |
1.500 |
1.500 |
| mix_m20 |
aggregate |
M20 mix, aggregate (parts by volume) |
3.000 |
3.000 |
| pcc |
thickness_mm |
PCC layer thickness (mm) |
75.000 |
75.000 |
| pcc |
footing_depth_m |
Average footing depth (m) |
0.450 |
0.450 |
| pcc |
footing_projection |
PCC width beyond the footing (multiplier on footing plan) |
1.200 |
1.200 |
| geometry |
opening_share |
Doors and windows (fraction of wall area) |
0.150 |
0.150 |
| geometry |
beam_slab_depth_ft |
Beam and slab depth taken off the wall height (ft) |
1.250 |
1.250 |
| stair |
width_m |
Stair width (m) |
1.000 |
1.000 |
| stair |
riser_m |
Stair riser height (m) |
0.170 |
0.170 |
| stair |
tread_m |
Stair tread width (m) |
0.250 |
0.250 |
| stair |
waist_m |
Stair waist slab thickness (m) |
0.150 |
0.150 |
| stair |
landing_count |
Mid-landings per stair (number) |
1.000 |
1.000 |
| lintel |
opening_height_m |
Average opening height (m) |
1.500 |
1.500 |
| lintel |
bearing_allowance |
Lintel length for bearing (multiplier on opening width) |
1.250 |
1.250 |
| lintel |
depth_m |
Lintel depth (m) |
0.150 |
0.150 |
| finish |
plaster_in |
Plaster thickness (inch) |
0.500 |
0.500 |
| finish |
screed_in |
Floor screed thickness (inch) |
2.000 |
2.000 |
| finish |
tiled_share |
Tiled part of the floor (fraction of floor area) |
0.900 |
0.900 |
| finish |
paint_coats |
Paint coats (number) |
2.000 |
2.000 |
| finish |
paint_sft_per_l |
Paint coverage (sft per litre per coat) |
100.000 |
100.000 |
| wastage |
cement |
Wastage of cement (fraction added) |
0.030 |
0.030 |
| wastage |
sand |
Wastage of sand (fraction added) |
0.070 |
0.070 |
| wastage |
aggregate |
Wastage of aggregate (fraction added) |
0.050 |
0.050 |
| wastage |
tiles |
Wastage of tiles (fraction added) |
0.100 |
0.100 |
| wastage |
paint |
Wastage of paint (fraction added) |
0.050 |
0.050 |
| wastage |
ready_mix |
Wastage of ready-mix (fraction added) |
0.030 |
0.030 |
| quick_cement_bag_sft |
low |
Quick rule: cement, low (bags per sft) |
0.400 |
0.400 |
| quick_cement_bag_sft |
typical |
Quick rule: cement, typical (bags per sft) |
0.450 |
0.450 |
| quick_cement_bag_sft |
high |
Quick rule: cement, high (bags per sft) |
0.500 |
0.500 |
| quick_steel_kg_sft |
low |
Quick rule: steel, low (kg per sft) |
3.500 |
3.500 |
| quick_steel_kg_sft |
typical |
Quick rule: steel, typical (kg per sft) |
4.000 |
4.000 |
| quick_steel_kg_sft |
high |
Quick rule: steel, high (kg per sft) |
4.500 |
4.500 |
| quick_concrete_m3_sft |
low |
Quick rule: concrete, low (m³ per sft) |
0.033 |
0.033 |
| quick_concrete_m3_sft |
typical |
Quick rule: concrete, typical (m³ per sft) |
0.038 |
0.038 |
| quick_concrete_m3_sft |
high |
Quick rule: concrete, high (m³ per sft) |
0.042 |
0.042 |
| quick_sand_cft_sft |
low |
Quick rule: sand, low (cft per sft) |
1.100 |
1.100 |
| quick_sand_cft_sft |
typical |
Quick rule: sand, typical (cft per sft) |
1.200 |
1.200 |
| quick_sand_cft_sft |
high |
Quick rule: sand, high (cft per sft) |
1.300 |
1.300 |
| quick_aggregate_cft_sft |
low |
Quick rule: coarse aggregate, low (cft per sft) |
1.350 |
1.350 |
| quick_aggregate_cft_sft |
typical |
Quick rule: coarse aggregate, typical (cft per sft) |
1.450 |
1.450 |
| quick_aggregate_cft_sft |
high |
Quick rule: coarse aggregate, high (cft per sft) |
1.600 |
1.600 |
| quick_bricks_sft |
low |
Quick rule: bricks, low (pcs per sft) |
8.000 |
8.000 |
| quick_bricks_sft |
typical |
Quick rule: bricks, typical (pcs per sft) |
8.500 |
8.500 |
| quick_bricks_sft |
high |
Quick rule: bricks, high (pcs per sft) |
9.000 |
9.000 |
| quick_area_sft_sft |
formwork |
Quick rule: formwork area (sft per sft of floor) |
3.000 |
3.000 |
| quick_area_sft_sft |
plaster |
Quick rule: plaster area (sft per sft of floor) |
4.000 |
4.000 |
| quick_area_sft_sft |
paint |
Quick rule: paint area (sft per sft of floor) |
4.200 |
4.200 |
| quick_area_sft_sft |
tiles |
Quick rule: tiles area (sft per sft of floor) |
1.000 |
1.000 |
| quick_rmc_removed |
cement |
Quick rule: cement that is concrete (fraction, dropped for ready-mix) |
0.670 |
0.670 |
| quick_rmc_removed |
sand |
Quick rule: sand that is concrete (fraction, dropped for ready-mix) |
0.440 |
0.440 |
| quick_rmc_removed |
aggregate |
Quick rule: aggregate that is concrete (fraction, dropped for ready-mix) |
1.000 |
1.000 |
| labour_skilled |
brickwork_m3 |
Skilled labour, brickwork (mandays per m³) |
0.900 |
0.900 |
| labour_skilled |
plaster_m2 |
Skilled labour, plaster (mandays per m²) |
0.120 |
0.120 |
| labour_skilled |
screed_tile_m2 |
Skilled labour, screed and tiles (mandays per m²) |
0.160 |
0.160 |
| labour_skilled |
concrete_m3 |
Skilled labour, structural concrete (mandays per m³) |
0.200 |
0.200 |
| labour_skilled |
pcc_m3 |
Skilled labour, PCC (mandays per m³) |
0.100 |
0.100 |
| labour_skilled |
formwork_m2 |
Skilled labour, formwork (mandays per m²) |
0.250 |
0.250 |
| labour_skilled |
steel_tonne |
Skilled labour, steel (mandays per tonne) |
0.100 |
0.100 |
| labour_skilled |
paint_m2 |
Skilled labour, paint (mandays per m²) |
0.040 |
0.040 |
| labour_skilled |
soling_m2 |
Skilled labour, soling (mandays per m²) |
0.050 |
0.050 |
| labour_unskilled |
brickwork_m3 |
Unskilled labour, brickwork (mandays per m³) |
1.400 |
1.400 |
| labour_unskilled |
plaster_m2 |
Unskilled labour, plaster (mandays per m²) |
0.120 |
0.120 |
| labour_unskilled |
screed_tile_m2 |
Unskilled labour, screed and tiles (mandays per m²) |
0.160 |
0.160 |
| labour_unskilled |
concrete_m3 |
Unskilled labour, structural concrete (mandays per m³) |
2.250 |
2.250 |
| labour_unskilled |
pcc_m3 |
Unskilled labour, PCC (mandays per m³) |
1.000 |
1.000 |
| labour_unskilled |
formwork_m2 |
Unskilled labour, formwork (mandays per m²) |
0.250 |
0.250 |
| labour_unskilled |
steel_tonne |
Unskilled labour, steel (mandays per tonne) |
1.900 |
1.900 |
| labour_unskilled |
paint_m2 |
Unskilled labour, paint (mandays per m²) |
0.040 |
0.040 |
| labour_unskilled |
soling_m2 |
Unskilled labour, soling (mandays per m²) |
0.100 |
0.100 |
| labour_rmc_scale |
skilled |
Ready-mix: skilled labour on concrete (fraction of site-mix mandays) |
1.000 |
1.000 |
| labour_rmc_scale |
unskilled |
Ready-mix: unskilled labour on concrete (fraction of site-mix mandays) |
0.500 |
0.500 |